SAP implementation

We provide our clients with implementation and consulting services in full range of SAP solutions. The system is implemented in accordance with the ASAP method preferred by SAP. Sophisticated, professional tools for the analysis and modeling of economic processes in the organization allow for the optimal configuration and adaptation of the system to the individual needs, requirements and expectations of the client.

Our software development tools also ensure that the system is adjusted to non-standard needs resulting from the specificity of the company’s operations.

Introduction of the SAP IT system is based on the standard implementation methodology developed by SAP and with use of the same tools, facilitating and organizing the documentation of design works, recording configuration steps and allowing to monitor the status of project implementation.

The system implementation process has been divided into 4 basic phases:

Phase 1. Project organization and implementation concept

In the first phase of the implementation model, the organization of design works is defined and the concept of their implementation is developed. This scheme describes how the economic processes of the enterprise are shaped and how they will be modelled in the SAP system.

Phase 2. Detailed design and prototyping

In the second phase of introduction model, a production system prototype is built and tested based on the implementation concept. The construction of the prototype consists in configuration of the SAP system in accordance with the requirements of the enterprise and the development of interfaces and data conversion programs.

Phase 3. Preparation for production operation

In the third phase of implementation, all preparatory activities and processes necessary to start the production system are performed.

Phase 4. Production operation of the system

After launching the production SAP system, it is necessary to create a permanent team supporting the operation of the system and to investigate the possibilities of optimizing its operation.

In almost every project there are ABAP programming works related to the development of functionality and system integration.